I read Toll paid $32M for the dirt, divided into 42 lots. $760k per lot.
It means they want/need to average $2,000,000+ per home, and four lower-income homes are required. Toll Brothers is planning to use at least 12 different floor plans for the 42 homesites. There will be a mix of one and two-story homes, ranging from approximately 1,600 to 4,000 square feet.
I read Toll paid $32M for the dirt, divided into 42 lots. $760k per lot.
I read Toll paid $32M for the dirt, divided into 42 lots. $760k per lot.
It means they want/need to average $2,000,000+ per home, and four lower-income homes are required. Toll Brothers is planning to use at least 12 different floor plans for the 42 homesites. There will be a mix of one and two-story homes, ranging from approximately 1,600 to 4,000 square feet.